The new swimming pool in Ans has been designed with a large south facing bay window to take full advantage of natural daylight. However the Belgian climate and long opening hours means that the swimming pool also needs indoor lighting. The Schréder “LED controlled by nature” solution was ideal for this building as it maximises daylight while balancing artificial light to ensure comfort and safety at all times with a dramatic reduction in energy costs and CO2 emissions.